This service call was for a tripped breaker but was preventable if the code had been followed during the original lighting installation. Code requires bushings be installed to protect sharp metal edges. In this install the were ran directly acros the sharp metal edges of the fixture. Aside from the...
Category: Commercial
Payless shoes called us up to troubleshoot their exit signs after the seattle fire marshall performed a safety inspection
Afraid of heights? let us bring our ladders and work on your lights!
We changed out the lights at Aerosoles at Kent Station. The lights were up really really high but with our specialized ladders we were able to reach them no problem. If you have been calling around for an electrical contractor that has the equipment needed to work on your lights...
The completed 75kva transformer install. Yeah, it works!
We provided a 200amp rated 480v panel and also a 200amp rated 120/208v panel. The added capacity allows for the install of labor saving equipment that will save much more than the several thousand it costs to install a transformer of this size.
Tapping into the main bus bars to feed a 75kva transformer
Business owner contacted us needing more power to feed his existing electrical equipment. We upsized the transformer in his production area
Gynormous electrical rack designed by Washington Electric
We use Case Engineering, for electrical drawings and plans
Or we can work with your Engineering firm to make your imagination a reality. Often a good project involves a good set of plans.
Why are we so good at troubleshooting?
This $1200 circuit-tracer helps us find electrical problems in minutes......when it would normally take hours. It took 5 minutes to find the problem pictured in this post!
200 amp feed for lucky Dog Kennels. Snohomish
Snohomish PUD was great to work with.